For the given cost matrix, how much is the total transportation cost calculated by Least-cost Method solution? (all costs in Turkish liras)


141

149

157

165

168


Yanıt Açıklaması:

The initial basic feasible solution obtained in the table below has the basic variables given below.

x12 = 9, x13 = 1, x23 = 4, x31 = 4, x41 = 7, x42 = 5,

The objective value for this solution, which is the total transportation cost is 149 TL.

Z = 8× 9 + 3 × 1 + 2 × 4 + 2× 4+ 4 ×7+ 6 × 8 = 149 TL.