Busıness Fınance I Deneme Sınavı Sorusu #847458

Which option is not taken into consideration as an aspects of production while a production budget is being prepared?


The term of production budget

The timing of production of each product type

The location of production

The cost figures to determine the cost per unit

The specific market for each product and service


Yanıt Açıklaması:

Option E is about sales budget.

Yorumlar
  • 0 Yorum