İşletme Bilgi Sistemleri Deneme Sınavı Sorusu #357569

There are four phases in EPS systems:

 I.Enterprise Resource Planning (ERP)

II.Material Requirements Planning (MRP)

III.Manufacturing Resource Planning (MRP II)

IV.Closed Loop Material Requirements Planning (MRP-CL)

 

Which of the followings gives the correct order of the phases in the Evaluation of the ERP systems?


II, IV, III, I

IV, II, I, III

II, III, I, IV

IV, I, II, III

I, III, II; IV


Yanıt Açıklaması:

Phase I - Material Requirements Planning (MRP), Phase II - Closed Loop Material Requirements Planning (MRP-CL); Phase III – Manufacturing Resource Planning (MRP II); Phase IV - Enterprise Resource Planning (ERP).

Yorumlar
  • 0 Yorum