aof.sorular.net
İşletme Bilgi Sistemleri
İşletme Bilgi Sistemleri Deneme Sınavı
İşletme Bilgi Sistemleri Deneme Sınavı Sorusu #386636
İşletme Bilgi Sistemleri Deneme Sınavı Sorusu #386636
Which transition approach is also called as “Big-Bang”?
|
Phased |
|
Pilot |
|
Parallel |
|
Incremental |
|
Direct |
Yanıt Açıklaması:
Direct: This transition approach, also called “Big-Bang”, is the direct change of the old system by the new system. It completes the change-over in the shortest-possible time.
Yorumlar
- 0 Yorum