İşletme Yönetimi Deneme Sınavı Sorusu #372359

I. measure performance

II. taking corrective action as needed

III. establish standards and methods to measure performance

IV. compare the actual performance with the established standards

 

Which of the following gives the correct order of the steps in the basic control process?


I, II, III, IV

II, I, III, IV

III, I, IV, II

IV, III, I, II

III, I, IV, II


Yanıt Açıklaması:

Steps in the basic control process follow the logic of planning: III, I, IV, II.

Yorumlar
  • 0 Yorum