- 1
Which of the following is not one of the responsibilities of the project manager, who is a stakeholder of the Scope and planning phase?
- 2
Which of the below is related to lengthening the service duration of the existing system, to reduce the likelihood of future system failures?
- 3
During the feasibility study, in general, for the proposed system solution.........types of feasibility steps are taken.
Which of following should be at dotted place?
- 4
What does SDLC stand for?
- 5
Which Computer-Aided Software Engineering tools help automatically find missing or incorrect features in the diagrams, display, and reporting?
- 6What stages does a Spiral model consist of?
- 7
"Includes technical support given to the system users in case of system failures and maintenance services for any failure or when new requirements arise."
Which of the following is defined above?
- 8
A systematic development process model is used to analyze and design information systems. This development process model is called ....................................................................
Which of the following should be at dotted place?
- 9
Which of the below is one of the advantages of a survey?
- 10
"Is the suggested system suitable to the structure of the business?"
What type of feasibility step does this question refer to?
- 11
I - Requirements Analysis
II - Design
III - Realization and Test
IV - Operation and Maintenance
V - Scope and Planning
VI - Setup and Distribution
Which option below shows the correct order of System Development Life Cycle?
- 12
- Software
- Hardware
- Data
- Communication
- Network technologies
Which of the above do information systems contain?
- 13What are the important phases of SDLC?
- 14
"It is often used when other techniques cannot answer all the aspects of the system in order to learn about the system itself."
What is the name of the method used to analyse the requirements?
- 15
- Change and regulations
- Scope and planning
- Cost reduction
- Operation and maintenance
Which of the above are among the phases of system development life cycle?
- 16
I. Is the new system really necessary?
II. What is necessary to realise the system?
III. What is necessary to make system suitable for business operations?
Which of the questions above need to be asked regarding the feasibility study?
- 17
In which system transition strategy the old system continues to operate until it is determined that the new system operates completely well?
- 18
"Many businesses use group works rather than separate and numerous interviews with individuals in order to determine requirements."
Which of the following does this statement refert to?
- 19
What does SDLC stand for?
- 20
- Surveys can be answered very quickly.
- It is a relatively cheap data collection technique from many people.
- In general, the number of respondents is high.
Which of the above can be considered among the advantages of using surveys for requirement analysis?