- 1
- Sampling records, forms and documents
- Surveys
- Prototyping
- Joint Application Design
Which of the methods above can be used to determine user requirements?
- 2
"In this stage, the new system is designed for faster access and the question to whether the system is suitable to the structure of the business is answered."
What is the name of the feasibility step as described above?
- 3
Which of the terms below is defined as the development of information system by using the sources that exist in the firm?
- 4
I. The old system continues to operate until it is determined that the new system operates completely well.
II. Letting the old system operate enables the analyst to compare the results.
III. The cost of the strategy is its disadvantage.
Which of the above is correct regarding the parallel system transition strategy?
- 5
Which of the below is defined as the development of information system by using the sources that exist in the firm?
- 6
"Need for information system renewal may be the result of changes in the laws and regulations instead of business demand or new technology."
Which of the below is defined by this definition?
- 7
Which of the following is conducted to investigate likelihood of the system development project?
- 8
In a linear sequential model what comes after development and test?
- 9
Which feasibility type deals with the question of whether the users will resist to the new system?
- 10
What is the purpose of feasibility study?
- 11
The success of the rest of the project depends on the correct definition of the problem. In which phase the problem is defined?
- 12
Which information development system model is an agile method that focuses on iterative development instead of technical approaches of agile methods?
- 13
Which of the following is a step of feasibility?
- 14
After completing the plan and determining the starting and finishing times of the activities that compose the information system development project, system requirements are analyzed. These requirements can be classified into three groups: functional requirements, nonfunctional requirements, and environment requirements.
To determine the functional requirements some questions asked.
Which of following is not one of them?
- 15
Which of the below is not one of the main phases of SDLC (System Development and Life Cycle) model?
- 16What is the scope of planning?
- 17
The System and Development Life Cycle model consists of 6 main phases.
Which of following is not one of them?
- 18
How many groups of requirements analysis are classified?
- 19
Which of the below is not one of the system maintenance activities?
- 20
Where should be operated (Pilot) first in the system transition strategy?