AÖF Soru Bankası
İSL357U

Operatıons Management (ENG)

Deneme Sınavı Soruları

  • 20 soru
  • Cevap anahtarı açık: çöz, sonucunu gör
0 doğru · 0 yanlış · 20 kaldı
  1. 1

    After the MRP, a more efficient system  was developed in order to overcome some of the inadequacies of MRP. With it companies were able to answer additional questions such as: “Is there enough capacity for the orders received?” and “Which resources are the bottleneck resources?”.

    According to the given information what is the name of this efficient system?

  2. 2

    All ________ that is more than necessary for a steady production flow in a Just-inTime manner is considered as waste.

    Which waste in Lean Systems is mentioned above?

  3. 3

    I.Identify Value

    II.Map the Value Stream

    III.Create Flow

    IV.Establish Pull

    V.Seek Perfection

    Which of the above are the main principles of lean systems?

  4. 4

    "______ is an integrated series of planning techniques developed to ensure the efficient use of all resources such as materials, machinery, money and people." 

    What is the term that defines the statement?

  5. 5
    1. Lean philosophy places a great importance in quality.
    2. One of the main ideas in lean philosophy is to determine and solve the problems.
    3. Just-in-Time production simply means producing the right quantity of products at the right place at the right time.
    4. Takt time is the rate of customer requests of products from the production line.
    5. TQM is a continuous improvement management concept and aims to reduce defects by standardizing each process and making the perfect production at the first time with very little variation to increase customer satisfaction.

    Which of the given statements are correct?

  6. 6

    What is the combination of all steps and processes over the entire life cycle of products or services?

  7. 7
    1. What is the best way to ship a product to a specific customer?
    2. What is the optimal production plan?
    3. How much product should ship to specific intermediaries? 
    4. How can outbound and inbound transportation costs be minimized?

    What is the name of the system which helps answer the questions above and designed to improve decision making in the supply chain?

  8. 8
    1. Value is defined by the quality of the product.
    2. Companies need to apply different methods to understand what their customers want.
    3. Value needs to be specified from the end customer’s standpoint and it also defines the price.
    4. The companies need to focus on eliminating waste to deliver the value that the customer expects at lowest cost and highest profitability.

    Which of the given above is correct for "value"?

  9. 9

    In which KAIZEN phase phase are the collected data and the results analyzed and their effectiveness are
    measured?

  10. 10

    Which of the following is an MRP system that includes production planning, master production scheduling, and capacity requirements planning?

  11. 11

    Which of the following is NOT one of the purposes of the master production schedule?

  12. 12

    Which of the following is not a component of the supply chain?

  13. 13

    What are the unnecessary movements of products, materials, tools, inventory, equipment, etc. considered as?

  14. 14

    Which one is true about service and manifacture?

  15. 15

    Which of the following decisions is true?

  16. 16

    Which of the following C was not identified by Walsh et al. (1992) as four “Cs” of design?

  17. 17

    "After discussions about the final design, agreed design is converted into detailed specifications. Some prototypes of the agreed design are produced and tested."

    Which main stage of design process is described above?

  18. 18

    "________________ means doing the right things to create the most value for the company."

    Which of the following options fills in the gap correctly?

  19. 19

    I.Understand the opportunity

    II.Develop a concept

    III.Define the concept

    IV.Implement a concept

    Which of above listed the phases correctly show three phases of the Product development process?

  20. 20

    It is aimed to produce 1600 products in an assembly line that works 12 hours a day.
    According to this information, how many seconds is the cycle time of the assembly line calculated?

Bir şıkka dokun; doğru cevap hemen görünür.
Yeni yılların sınavlarını da çözOperatıons Management (ENG) dersinin tüm sınavları, cevap anahtarları, süreli mod ve yanlış analizi uygulamada.Uygulamada aç