  1. 1

    What are the expected results over the course of a project called (e.g. making a list of specifications during a furniture design project)?

  2. 2

    Which of the followings is an activity that has more than one activity immediately preceding it (more than one dependency arrow flowing to it)?

  3. 3
    Which of the following is FALSE according to this figure?
  4. 4

    In projects start times is generally ....?

  5. 5

    Which of the following is among the questions that a project objective can answer?

    1. What?
    2. When?
    3. How much?
  6. 6

    Which of the following is not one of the project characteristics?

  7. 7
    Which of the following is not one of the tasks that a work package manager is responsible for?
  8. 8
    Which of the following is TRUE about the following figure?
  9. 9

    Which of the following statements is not true regarding a project?

  10. 10

    Which of the followings present the obeys about the drawing an activity-on-node project network?

    1. A network commonly flows from left to right.
    2. When all preceding connected activities have been performed, a new activity can start.
    3. Precedence relations and flows are represented by arrows on networks, arrows can also cross over each other.
    4. Any loop of activities is not allowed in the network.
    5. There should be no conditional statements between activities.
  11. 11

    Which of the following is the term that defines one begins with the last project activity/ies and goes along the other sequential activity/ies through the network through the first activity/ies?

  12. 12

    Which of the following is not a project?

  13. 13

    Which of the followings is a point with zero duration that indicates a cumulative sequence of events while performing the project?

  14. 14

    Which of the followings is NOT true for the characteristics of a project?

  15. 15

    ............................. definition is the process of developing a detailed description of the project and product.

    Which of the following should come to the dotted point according to the continuation of the sentence?

  16. 16

    Which of the followings is included in the checklist to guarantee that scope definition is complete?

    1. Project objective
    2. Milestones
    3. Technical Requirements
    4. Deliverables
  17. 17

    Project scope is the keystone engaging all elements of a project plan. To guarantee that scope definition is complete, there is a checklist.  Which of the following is the "significant point or event in the project" from these checklist?

  18. 18

    Which of the following behaves as a link, but it is not a “real” activity, so it does not have time duration?

  19. 19

    ............................. is a non-simple, non-repetitive, one-time effort limited by budget, schedule and performance specifications designed to meet customer needs

    According to the definition, which of the following should come to the dotted point?

  20. 20

    Which of the following can be defined as the process of developing a detailed description of the project and product?