    What is the latency between the initiation and completion of a process called?

  2. 2

    Which one of the following can not be given as an example for the facility constraints while designing the supply chain network?

  3. 3

    __________ is defined as the cost of making and delivering the products to the customers.

    Which of the following fills in the blank correctly?

  4. 4

    Which of the following factors include taxes, tariffs and exchange rates?

  5. 5

    ________________ systems are the systems in which production planning is done before the observation of actual demand.

    Which of the following completes the sentence above?

  6. 6

    How can you define that materials to be collected from (or delivered to) multiple facilities are collected (or delivered) via a certain route to minimize total routing and transportation costs?

  7. 7

    Which of the following is not a problem that is needed to analyzed in the production  phase?

  8. 8
    1. Reduce work-in-process inventories, thus decreasing inventory costs and waste
    2. Easy to quickly identify quality problems before large inventories of defective parts are manufactured
    3. When coordinated with a JIT purchasing program, ensures the smooth flow of materials throughout the entire production process

    Which of the above are advantages of JIT?

  9. 9

    The distance between the supplier and manufacturing plant is 100 km, from man. plant to a distribution center is 500 km, from distribution center to customer 1 is 350 km. The customer demands 3000units of products. The unit shipment cost is $0.3 per unit per km so, what is the daily total shipment of this flow?

  10. 10

    Which one of the following can be considered as an example of the social objectives in supply chain network design?

  11. 11

    Which of the following can also be called the traditional supply chain?

  12. 12

    Which of the following is not one of the characteristics of forecasts?

  13. 13

    Which one of the following decisions include the determination of the number, locations and capacities (manufacturing plants, distribution centers, warehouses etc.)?

  14. 14

    The distance between the supplier and manufacturing plant is 100 km, from man. plant to a distribution center is 300 km, from distribution center to customer 1 is 300 km. The customer demand for 4000 units of products. The unit shipment cost is $0.3 per unit per km so, what is the daily total shipment of this flow?

  15. 15

    “It is a forecasting technique that is generally used when the data has a certain trend, such as the values either increase or decrease over time. This method requires two smoothing constants, α and β and has two smoothing equations”.

    Which forecasting technique is described above?

  16. 16

    Suppose that demand for a product was 40, 60 and 80 units in period 1, period 2 and period 3 respectively. What is the forecasted demand in period 4 if we use three month moving average?

  17. 17

    Which one of the following ensures obtaining the supply chain structure which provides the minimum possible total supply chain cost?

  18. 18
    1. Uncertainty
    2. Capacity Planning
    3. Rolling Horizons
    4. Lead Times Dependent on Lot Sizes

    Which of the above terms are shortcomings of MRP?

  19. 19

    Which of the following is one of the outputs of logistics?

  20. 20

    ................. are generally designed to transport huge amounts of a single type of product over long distances.

    Which of the following completes the sentence above?