What is the latency between the initiation and completion of a process called?
- 2
Which one of the following can not be given as an example for the facility constraints while designing the supply chain network?
- 3
__________ is defined as the cost of making and delivering the products to the customers.
Which of the following fills in the blank correctly?
- 4
Which of the following factors include taxes, tariffs and exchange rates?
- 5
________________ systems are the systems in which production planning is done before the observation of actual demand.
Which of the following completes the sentence above?
- 6
How can you define that materials to be collected from (or delivered to) multiple facilities are collected (or delivered) via a certain route to minimize total routing and transportation costs?
- 7
Which of the following is not a problem that is needed to analyzed in the production phase?
- 8
- Reduce work-in-process inventories, thus decreasing inventory costs and waste
- Easy to quickly identify quality problems before large inventories of defective parts are manufactured
- When coordinated with a JIT purchasing program, ensures the smooth flow of materials throughout the entire production process
Which of the above are advantages of JIT?
- 9
The distance between the supplier and manufacturing plant is 100 km, from man. plant to a distribution center is 500 km, from distribution center to customer 1 is 350 km. The customer demands 3000units of products. The unit shipment cost is $0.3 per unit per km so, what is the daily total shipment of this flow?
- 10
Which one of the following can be considered as an example of the social objectives in supply chain network design?
- 11
Which of the following can also be called the traditional supply chain?
- 12
Which of the following is not one of the characteristics of forecasts?
- 13
Which one of the following decisions include the determination of the number, locations and capacities (manufacturing plants, distribution centers, warehouses etc.)?
- 14
The distance between the supplier and manufacturing plant is 100 km, from man. plant to a distribution center is 300 km, from distribution center to customer 1 is 300 km. The customer demand for 4000 units of products. The unit shipment cost is $0.3 per unit per km so, what is the daily total shipment of this flow?
- 15
“It is a forecasting technique that is generally used when the data has a certain trend, such as the values either increase or decrease over time. This method requires two smoothing constants, α and β and has two smoothing equations”.
Which forecasting technique is described above?
- 16
Suppose that demand for a product was 40, 60 and 80 units in period 1, period 2 and period 3 respectively. What is the forecasted demand in period 4 if we use three month moving average?
- 17
Which one of the following ensures obtaining the supply chain structure which provides the minimum possible total supply chain cost?
- 18
- Uncertainty
- Capacity Planning
- Rolling Horizons
- Lead Times Dependent on Lot Sizes
Which of the above terms are shortcomings of MRP?
- 19
Which of the following is one of the outputs of logistics?
- 20
................. are generally designed to transport huge amounts of a single type of product over long distances.
Which of the following completes the sentence above?