aof.sorular.net
İşletme Bilgi Sistemleri
İşletme Bilgi Sistemleri Deneme Sınavı
İşletme Bilgi Sistemleri Deneme Sınavı Sorusu #350763
İşletme Bilgi Sistemleri Deneme Sınavı Sorusu #350763
Which of the following is the very first phase in System Development Life Cycle?
Scope and planning |
Requirement analysis |
Design |
Realization and test |
Setup and distribution |
Yanıt Açıklaması:
In the first phase of System Development Life Cycle, scope, opportunities and goals of the problem represented by the information system project are determined. The success of the rest of the project depends on the correct definition of the problem. In the scope of the problem; size, borders, vision, constraints, limits, stakeholders, budget and timing of the project are determined.
Yorumlar
- 0 Yorum