AÖF Soru Bankası
İSL358U

Project Management (ENG)

Deneme Sınavı Soruları

  • 20 soru
  • Cevap anahtarı açık: çöz, sonucunu gör
0 doğru · 0 yanlış · 20 kaldı
  1. 1

    Which of the below is FALSE related to the comparison between AOA and AON?

  2. 2

    Which of the followings is NOT true for the points to be considered while defining a project work package?

  3. 3

    An activity on arrow network includes 5 events, A, B, C, D and E. In that network, event C depends on event A and event B; event D and event E depend on event C. According to this, which of the following represent the precedence of the C? 

  4. 4

    Which of the followings can be given as examples of recent projects?

    1. The English Channel tunnel
    2. The International Space Station
    3. The Manhattan Project
    4. SpaceShipOne
  5. 5

    Which of the followings is an activity that has more than one activity immediately preceding it (more than one dependency arrow flowing to it)?

  6. 6

    Which project management process group includes tasks such as creating Work Breakdown Structure, defining scope and management, and describing risks?

  7. 7
    Which of the following is not one of the phases of project Life Cycle?
  8. 8

    What is the theorem which says: “Where a series of sequential independent activities lie on the critical path of a network, the sum of the individual activity durations will be distributed in approximately normal fashion, regardless of the distribution of the individual activities themselves. The mean of the distribution of the sum of the activity durations will be the sum of the means of the individual activities and its variance will be the sum of the activities’ variances”?

  9. 9

    In which step of the Resource management are resources assigned to the specific activities in the project schedule?

  10. 10

    Which of the following cannot be used to evaluate the resource management software?

  11. 11

    "... is the time phased processing of operations subject to precedence interactions, time constraints, and resource constraints in order to achieve particular goals."

    Which of the following would best fill the blank space above?

  12. 12

    Which of the followings are the factors through which outcomes of a project
    are evaluated

    I - budget limit

    II- resouces allocated

    III- required performance

    IV- due date 

  13. 13

    All of the following statements about PERT is true, except...

  14. 14

    "... occurs when there is a prevalent predecessor for two or more operations."

    Which of the following would best fill the blank space above?

  15. 15

    ............... helps the project manager to identify the required project tasks, to identify the required resources and costs, to establish priorities, and to plan and update schedules when a project continues from one phase to the next? 

  16. 16
    Which of the following is not one of the five sets of process groups, of which project management consists?
  17. 17

    Which of the following is not one of the techniques and tools used to estimate the resources for each activity in the project schedule? 

  18. 18

    Which of the following is false regarding projects?

  19. 19

    Which of the followings present the obeys about the drawing an activity-on-node project network?

    1. A network commonly flows from left to right.
    2. When all preceding connected activities have been performed, a new activity can start.
    3. Precedence relations and flows are represented by arrows on networks, arrows can also cross over each other.
    4. Any loop of activities is not allowed in the network.
    5. There should be no conditional statements between activities.
  20. 20

    Which of the following steps comes first in a successful resource management
    process?

Bir şıkka dokun; doğru cevap hemen görünür.
Yeni yılların sınavlarını da çözProject Management (ENG) dersinin tüm sınavları, cevap anahtarları, süreli mod ve yanlış analizi uygulamada.Uygulamada aç