"A temporary endeavor undertaken to create a unique product, service, or result" is the definition for:
- 2
Which of the following may not be true for projects?
- 3
In which step of resource management do we sum the resources that are required to complete all the activities with respect to the resource allocation step outputs?
- 4
............................. definition is the process of developing a detailed description of the project and product.
Which of the following should come to the dotted point according to the continuation of the sentence?
- 5
Which of the following are the main attributes that distinguish project management from traditional forms of management, i. e. the fundamentals of project management?
- I. Stakeholders
- II. Team
- III. Scope
- IV. Methodology
- V. Outcome
- VI. Manager
- 6
Which of the followings are a part of the project definition?
- An activity with a specific and unique objective
- An activity with a start and end date
- An activity that have specific time, cost and performance requirements
- A project is a temporary endeavor under taken to create a unique product, service or result
- 7
Which of the following is a difference between project and program?
- 8
Which of the followings represent true definitions about the calculations of the mean time and variance in PERT?
- The formula for the mean is a simple weighted average of the three estimates.
- The formula assumes that the optimistic and pessimistic estimates are equally possible.
- The formula assumes that the modal is four times more likely than the optimistic and pessimistic estimations.
- The standard deviation is one-three of the range between optimistic and pessimistic time.
- 9
Which of the followings is NOT true for the characteristics of a project?
- 10
Which of the following is not one of the evaluation factors of a project outcomes?
- 11
I. Node
II. Arrow
III. Activity
Which of above is among the components of the network?
- 12
I. network planning
II. network implementation
III. network control
IV. network scheduling
Which of the above are the stages of the fundamental network assessment of the project?
- 13
I. Introduction
II. Staffing requirements
III. Staff assignments
IV. Reassignment partsWhich of the above are components of a good staffing management plan?
- 14
Which of the following is not one of the services of the Project Management Institute?
- 15
What does the pre-planning, scheduling and resource allocation method for maximizing the effectiveness mean?
- 16
....... are performed when one tries to define a logical dependency?
- 17
How many kinds of data are required to describe a project?
- 18
............... is a temporary endeavor undertaken to create a unique product, service, or result.
Which term can be used in the blank?
- 19
What is the first phase of project life cycle which involves identification and specification of the project called?
- 20
Which of the followings is NOT true for a project?