Project Management (ENG)
Deneme Sınavı Soruları
- 20 soru
- Cevap anahtarı açık: çöz, sonucunu gör
- 1Which of the following is FALSE about Work Breakdown Structure (WBS)?
- 2
Which of the following phases of project life cycle typically takes the longest?
- 3
Which of the following is a method for dividing the overall project into smaller elements that is called work packages?
- 4
Which three factors are usually used to evaluate the outcomes of a project?
- I- management
- II- cost
- III- monitoring
- IV- schedule
- V- methodology
- VI- competition
- VII- performance
- 5
Which of the following is not provided to the project manager by the project management methodology between phases?
- 6According to the figure, which one is NOT a critical activity?

- 7
Which of the following phases comes first in a project life cycle?
- 8
Which of the following is NOT one of the principles to adopt when creating an AOA network diagram?
- 9
Which of the followings is NOT true?
- 10
Which of the following is not one of the project characteristics?
- 11
............... is a method for dividing the overall project into smaller elements that are called work packages?
- 12
Which of the followings is NOT one of the the Four M’s, which is a common framework for defining the resources available for a project?
- 13
Which of the followings are the stages in which the fundamental network assessment of the project is carried out?
- Network planning
- Network scheduling
- Network monitoring
- Network control
- 14
Which of the following is wrong for work packages?
- 15
....... typically forms the lowest level in the Work Breakdown Structure?
- 16
Which of the following is the first step in PERT analysis?
- 17
The stages of design, production and implementation are included in which of the phases of a project life cycle?
- 18
Which of the following represents the true definitions about comparison between "activity on arrow (AOA)" and "activity on network (AON)"?
- The dummy activities in AON representation are not necessary.
- AON can be drawn and read more readily.
- In AOA, activity can only begin once all of its predecessors have been completed.
- AON enables the depiction of overla /lag.
- AON enables four kinds of relationships to be represented while AOA enables only finish to start relationship.
- 19
At what step of resource management, can the dates of the tasks be delayed in order to overcome the overallocation of resources?
- 20
Which of the following step of Resource Management, known as the first step, aims to identify the types, amount, and characteristics of the resources needed to accomplish the activities?