  1. 1

    I.    network planning

    II.   network implementation

    III.  network control 

    IV.   network scheduling

    Which of the above are the stages of the fundamental network assessment of the project?

  2. 2

    I. Node

    II. Arrow 

    III. Activity

    Which of above is among the components of the network?

  3. 3

    Which of the below is FALSE related to the comparison between AOA and AON?

  4. 4

    Which of the below is FALSE related to the major steps in PERT analysis?

  5. 5

    I. CPM

    II. PERT

    III. Decision Tree

    Which of above can be considered as techniques of network analysis for project scheduling?

  6. 6

    Which of the following is the first step in PERT analysis?

  7. 7

    Until when were projects planned utilizing bar charts?

  8. 8

    Which of the following is not one of the principles in adopting when creating an Activity on Arrow network diagram?

  9. 9

    Which of the below occurs when there is a prevalent predecessor for two or more operations?

  10. 10

    Which of the below is NOT one of the components of the network?

  11. 11

    What is a visual representation of the project’s content and goals called?

  12. 12

    Which of the following is a data required to describe a project?

  13. 13

    Which of the following statement is false about the "advantages and limitations of PERT"?

  14. 14

    Which of the following information is FALSE about CPM?

  15. 15

    The steps of the PERT analysis are presented scratchily as follows. Which of the following represents the right sequences of these processes about the PERT analysis? 

    1. Compute the variance of each activity. 
    2. Determine three estimates; optimistic “a”, modal “m”, and pessimistic “b” durations for each activity.
    3. Calculate the expected value for each activity by using a, m, and b.
    4. Similar to expected duration, calculate the variance of the project as the sum of individual variance of activities on the critical path.
    5. Calculate the expected project duration, Tx.
    6. In addition to expected project duration, the probability of finishing the project within specified time limits can be calculated.
  16. 16

    Which of the following refers to activities that may have been carried out before, containing a considerable number of elements of chance?

  17. 17

    "Projects were planned utilizing bar charts until around ________." Which of the following can complete the gap correctly?

  18. 18

    "... is the time phased processing of operations subject to precedence interactions, time constraints, and resource constraints in order to achieve particular goals."

    Which of the following would best fill the blank space above?

  19. 19

    Which of the following is used to show one significant event?

  20. 20

    Which of the below is NOT of the types of the projects that PERT and CPM can be applied to?