Project Management (ENG)
Ünite Sınavı Soruları
- 20 soru
- Soru metinleri açık; şıklar ve cevap anahtarı uygulamada
- 1
Which of the following is used for drawing of the network which in it is able to be ignored statistical considerations and consider on a single estimate of the mean time needed to carry out the activity?
- 2
Which of the followings is one of the kinds of data required to describe a project?
- Activity information
- Variable information
- Precedence relationships
- Time information
- 3
Which of the following is NOT one of the principles to adopt when creating an AOA network diagram?
- 4
I. Compute the variance of each activity by using formula
II. Calculate the expected project duration
III. Calculate the expected value of each activity
Which of above is among the major steps of PERT?
- 5
Which of the followings represents the identification of the specific project activities, precedence requirements such as technological, procedural or imposed limitations and the network diagrams?
- 6
Which of the followings is NOT true for activity-on-node network (AON)?
- 7
Which of the symbols below represents the most likely time?
- 8
Which of the followings are the stages in which the fundamental network assessment of the project is carried out?
- Network planning
- Network scheduling
- Network monitoring
- Network control
- 9
Which of the following network component refers to an arrangement of precedence that determines the pattern of activities?
- 10
Which of the below activity is the one that instantly follows it?
- 11
Which of the below is one of the kinds of data are required to describe a project?
- 12
Which of the followings is NOT one of the components of a network?
- 13
Which of the following is NOT one of the differences between AOA ve AON?
- 14
Which of the following components of a network can be defined as "an arrangement of precedence that determines the pattern of activities"?
- 15
All of the following are the stages of the fundamental network assessment of the project, except...
- 16
I. Time information
II. Presedence relationdhips
III. Activity relationships
IV. Restrictions
Which information above is required to describe a project?
- 17
Which of the following information is FALSE about the steps of PERT?
- 18
Which of the following is not one type of project that the Program Evaluation and Review Technique and Critical Path Method can be applied to?
- 19
All of the following statements about PERT is true, except...
- 20
Which of the following is not one of the components of the network?